Steel Installation

Before - Bright Red Steel on strapping, no roof deck, improper underlay

After - Deep Grey Steel with 1/2" roof deck and premium high temperature ice and water underlayment, the best roofing system, a roof under a roof, steel protecting the subsystem from UV, the subsystem protecting the attic from any frost or condensation that is apt to form on the underside of the steel

During - Old steel removal in progress

During - Old steel removed

During - Plywood install underway

During - Midway removing old steel and installing plywood and proper underlay

During - Removal and underlay in progress

During - Removal and underlay in progress

During - Underlay completed

During - Underlay completed

During - Steel install begins

During - Installing steel towards dormer, using GOAT steep slope access device

During - Detail of dormer valley install

During - Dormer steel completed

During - Steel install in progress

During - Replacing front fascia metal with new

After - Front install completed, two rows of ice blockers/snow stoppers due to the steep slope

After - Rear install completed, extra Optimum ventilators added to augment the integrated ridge venting system used on all steel roofs

After -Rear install completed, two rows of ice blockers/snow stoppers due to the steep slope

After - Front install completed, new counter flashing installed around dormers